From: route@monster.com
Sent: Saturday, April 16, 2016 2:07 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
OBJECTIVE: |
My work ethics are great and i'm
dependable. |
|
EXPERIENCE: |
7/2013 - Present |
Kineticom |
telecom |
|
Industry: |
|||
|
|
|||
|
I am contracted to be a
Construction Supervisor through General Dynamics for the Ericsson LTE upgrade
for AT&T in the New York market. My duties are to insure the General
Contractor performs all function of installation of the LTE. The upgrade is
as fo |
|||
|
I am contracted to be a
Construction Supervisor through General Dynamics for theEricsson LTE upgrade
for AT&T in the New York market. My duties are to insure theGeneral
Contractor performs all function of installation of the LTE. The upgrade is asfollows
to install 3 antenna’s with RRU’s and the Squid where the fiber and power
lands,these are installed on the tower. Inside the shelter I am responsible
to insure that all theequipment pertaining to the LTE are installed to the
customers satisfaction . This is toinclude all breakers,DC6, rectifiers GPS
module, Power modules Once all the equipmentis installed correctly my duties
are to do a NTP and submit it to General Dynamics for thecompany to submit to
AT&T, so intern they can submit to Ericsson for them to moveforward and
install the upgrade equipment. I also work with the tracker to make sure
thatGeneral Dynamics knows what needs to be done to get the site upgraded |
|||
|
7/2012 - Present |
WFI (Wireless Facilities Inc) |
||
|
Industry: |
|||
|
|
|||
|
As a Construction Manager/
Commissioning & Integration Technician I was contacted by WFI to do there
site surveys. Which consisted of me preforming duties, as in showing WFI
placement of equipment, showing routes for power, Telco, Fiber(hybrid
cable),Laser shots, Took various pictures to insure there was room enough for
antenna placement, equipment placement, and to insure routing of cables. Took
measurements of compound. Filled in documents. To show that all duties were
performed. WFI felt that I was a good candidate to send to school for Commissioning
and Integration, which resulted in getting my Commissioning & Integration
Certification. My responsibilities were to control and insure that GC's
completed all tasks assigned in a safe and timely manner. Manage the
installation of all flexi equipment, antenna's ,cat5 runs and installation of
all cabling & conduit runs. I managed the training and development of
subordinates on the task of commissioning and integration, and then insured
that all NSN / T-Mobile Flexi equipment was installed, commissioned and
integrated to customer’s standard. I completed all trackers, close out and
call testing for site completion for deliverables. I was laid off, due to no
work at this time. |
|||
|
8/2006 - 6/2012 |
Velocitel |
||
|
Industry: |
|||
|
|
|||
|
Installed ciena's 311 & 310
for Comcast. Did Link Validation on the 311, Tested with JDSU on the 310,
Took readings for db'sDid site walks for customerWas in-charge of crews
installing conduit for fiber in Seattle for AT&TRan crews for Motorola
install of 4812Was in charge of crews to install and integrate RX-AIT
equipment for AT&TPerformed installation of RXAIT equipment for Cingular.
After Roll-Out was complete, went to Schoolfor Velocitel Inc. and completed
RF Hazard Awareness & Safety Training- EME Hazard Awarenessclasses. Then
was sent out to do RF Readings and do drawings of buildings or water towers.
Also haveOSHA Certification. First Aid certified,Current U.S. Passport |
|||
|
2/2006 - 8/2006 |
AIC SYSTEMS |
||
|
Industry: |
|||
|
|
|||
|
Did Audits' Install RX-AIT rack
and populate rack. Run all cables, Install TDMA cables SMA cables Install
Atten. Fap then power to all RX-AIT's then call Switch or NOC and cut site
over. Also have RF Card for doing RF Readings |
|||
|
9/2005 - 10/2005 |
AFL Telecummunications |
||
|
Industry: |
|||
|
|
|||
|
Was dispatched to Houston for
T-Mobile, & Nokia for Disaster Relief for Fema. Did damage control.
(Equipment) Install and Software Upgrade at various Central Office and Cell
Sites damage done by Katrina & Rita |
|||
|
4/2004 - 8/2005 |
S-Com |
||
|
Industry: |
|||
|
|
|||
|
Resume Headline: Central Office /
DC Power Installer / Cable TechnicianEXPERIENCE: 1/2005 TO Present S-ComRan
T-1's for BTS Also used T-Berd Installed Ericsson 2206 and 2106, Installed
BYST's, Alarm cables, T1's, punched down 66 blockfor Alarms,Power Cables,Ran
Jumpers for Hard Lines, Ran Grounds and put on all lugs.Industry:
Telecommunications/Wireless Technician IIIInstalling Nokia equipment for T
moble, CingularConsist's of BYST'S, FXC Cards,TRX(Radio's) BOA cards, SMA
cables, Batteries, Rectifiers, T1'S and Cat 5e.911 Cables, ET2, Internal and
external jumpers, BB2 Cards and Installing all Componets forPurcell. Removed
Nokia Equipment and Replaced with new BTS. Also did sweeps for external
jumpers PTID # 001EX100274 |
|||
|
EDUCATION: |
10/2012 - 10/2012 |
Nokia Siemens Networks |
|
|
|
|||
|
Commissioning & Intergration |
|||
|
8/2012 - 8/2012 |
Nokia Siemens Networks |
||
|
|
|||
|
Tower & Ground |
|||
|
7/2010 - 7/2010 |
OSHA |
||
|
|
|||
|
6/1999 |
Ameri- Com |
||
|
|
|||
|
8/1971 - 9/1974 |
Army |
||
|
|
|||
|
LANGUAGES: |
Languages |
Proficiency Level |
English |
Fluent |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||